Mailisaba church began in July 2014 as a home church with 4 people. A 12’ x 24’ canvas and pole structure was built when they reached 24. Continuing to grow into 40+ we built a larger structure with iron sheets for a roof measuring 14’ x 42’. In the fall of 2015 the congregation was averaging 55+ and plans were made to build a permanent building on land the ministry had purchased. In February 2016 the 65+ congregation moved into their new 30’ x 70’ pole barn Worship Centre!

The congregation as of the beginning of April is averaging over 75 each and every week. To God be all the glory…

It is exciting to see this congregation continuing to grow both numerically and spiritually! The next stage of construction is building the walls.

Bricks 14,000 10 140,000
Cement / bg 110 800 88000
Dumb Roof Paper 1 5000 5000
Timber for lendors (qnt.) 1 10,000 10000
Sand / lorrie 8 12,000 96000
Concrete / lorrie 4 12,000 48000
Y Twisted bars 40 550 22000
R 6 Bar 20 300 6000
Binding Wire / kg 10 150 1500
Nails / kg 10 200 2000
Labour 120,000

Total cost (538,500kshs) approx. $5,700 USD